Early access open
Construction runs on subcontracting more than any other sector in Australia, and it carries the heaviest paperwork because of it. A single site can hold a dozen trades, each licensed by a different authority, each carrying tickets that expire on their own schedule.
This page covers what gets subcontracted in this sector, the credentials worth confirming, and how a job runs on Workforce Marketplace. Early access is open.
What gets subcontracted
The packages that most often move between businesses are:
- Trade packages let by a head contractor: carpentry, concrete and formwork, brickwork, plastering and rendering
- Civil and earthworks, including bulk excavation, drainage and road works
- Scaffolding and access, and the crane and rigging work that goes with it
- Demolition and strip-out, including asbestos removal where the material is present
- Traffic management on any job touching a road or footpath
- Site labour hire during programme compression, usually on day rates
Credentials that matter here
Construction credentials split into three groups, and confusing them is the most common failure. Nationally recognised safety cards, state-issued trade and contractor licences, and high risk work licences tied to a specific class of activity.
- White Card (CPCCWHS1001), nationally recognised through any RTO. The floor for anyone on site, and it proves nothing beyond induction
- Builder’s Licence, issued by the state building authority: NSW Fair Trading, the VBA in Victoria, the QBCC in Queensland. Contractor licences and worker qualifications are separate things
- High Risk Work Licences for scaffolding (SB, SI, SA), rigging (RB, RI, RA), dogging, tower and mobile crane, forklift and boom-type EWP, each issued by the state WHS regulator
- Asbestos Removal Licence Class A for friable material or Class B for non-friable, through the state WHS regulator. Class B does not cover Class A work
- Demolition Licence through the state building authority
- Traffic Controller Certification and, for design work, Traffic Management Designer
Every one of these except the White Card and the traffic tickets is issued per jurisdiction. Mutual recognition lets a holder obtain an equivalent licence elsewhere, but that is a process they complete, not an automatic entitlement. If the job crosses a border, confirm the licence covers the state the work is in.
What to confirm before work starts
An active ABN. Where a supplier does not quote one, you are generally required to withhold 47 per cent of the payment and remit it to the ATO. Their GST registration also tells you whether the price should carry it.
That the credential is held by the entity you are contracting with. A person can hold a qualification while the business you are paying holds nothing. Check the name on the document against the name on the invoice.
Insurance appropriate to the scope. Public liability is the common one. Depending on the work you may also need professional indemnity, and workers compensation if they carry their own staff.
That the engagement is genuinely a contract for services. Since the Fair Work amendments the test looks at the real substance of the relationship rather than the label on the paperwork, and getting it wrong creates back-pay, superannuation and payroll tax exposure. Contractor vs employee in Australia sets out how it now works.
Writing a scope that gets comparable quotes
Construction quotes stop being comparable the moment the scope leaves anything to interpretation. The details that move the number are the programme and who carries liquidated damages, whether the site is occupied and work must run out of hours, who supplies and who fixes materials, what access and craneage look like, whether the price includes making good, and who is responsible for waste removal. Leaving those out does not save time, it moves the conversation to the variation stage where it costs more.
How it works on Workforce Marketplace
Post the scope with the payment structure it actually uses, whether that is fixed price, hourly, daily, quoted or split into milestones for staged work. Subcontractors apply, and you compare them side by side rather than chasing callbacks.
Every account is ABN-verified at sign-up. Beyond that, subcontractors can submit licences, certifications and insurance for verification, which we review rather than grant automatically. Their profile shows the status against each credential without showing the document, the licence number or the ABN. Verification is opt-in, so a profile may hold credentials that have not been submitted, and it reflects the document as at the date it was reviewed rather than standing indefinitely.
Applying for work costs nothing and there are no leads to buy. Payment runs through Stripe, and Workforce Marketplace never stores your card or bank details.
Related guides
- Find subcontractors in Australia
- How to find subcontractors for your business
- What insurance does a subcontractor need in Australia?
- How to invoice as a subcontractor in Australia (with GST)
Post work, or apply for it, from the same account. Early access is open.